Four scenarios

4-in-1 Suite

This flagship showcase implements the 4 signature enterprise use cases featured on AG Grid's flagship live showcase: Performance (100k virtualized rows), Finance (real-time high-frequency market tickers with price flashes and SVG sparklines), HR Directory (hierarchical organizational tree with manager-report relationships and avatars), and Inventory Logistics (master-detail product catalog with multi-warehouse stock breakdown).

Built with FlexCore controls in C#. No third-party JavaScript grid library; GridControl loads its own interop script on demand. Runs on Blazor Server or WebAssembly.

Live Demo

Dataset Scale: Loaded: 100,000 rows | Gen Time: 99.0 ms | Rendered: visible window only
Performance Benchmark: Currently rendering 100,000 records with virtualized row recycling. Only visible elements plus buffer window reside in the DOM. Try sorting any column, filtering via the search box, or dragging the scrollbar rapidly.
Drag a column header here to group by that column
ID Project Task Description Assignee Priority Status Progress Budget Actual Variance Risk Due Date
1Metropolitan Transit HubFoundation Pour & Post-Tension #0001Priya PatelMediumIn Progress
78%
$68,400$58,575+$9,825Low2026-04-06
2Metropolitan Transit HubCurtain Wall Glazing #0002Marcus VanceLowOn Hold
43%
$35,500$35,580-$80Low2026-04-26
3Skyline Tower Phase IIDrywall & Fire-Rating #0003Elena RostovaLowReview Needed
54%
$22,200$24,022-$1,822Low2026-07-31
4Skyline Tower Phase IICurtain Wall Glazing #0004Gabriel SantosMediumCompleted
19%
$18,300$16,896+$1,404Low2026-07-17
5Metropolitan Transit HubFinal Inspection & Commissioning #0005Devon ChenMediumIn Progress
9%
$19,000$21,140-$2,140High2026-05-22
6Harborview CondominiumsHVAC Ductwork & Chiller Install #0006Marcus VanceHighCompleted
11%
$56,200$46,102+$10,098High2026-06-10
7Apex Data CenterCurtain Wall Glazing #0007Sarah JenkinsCriticalApproved
6%
$20,600$20,304+$296Low2026-04-11
8Riverfront EsplanadeUnderground Utility Tie-Ins #0008Sarah JenkinsMediumIn Progress
40%
$20,100$21,339-$1,239Low2026-04-26
9Metropolitan Transit HubElectrical Substation Wiring #0009Liam O'ConnorMediumIn Progress
89%
$49,900$55,734-$5,834Critical2026-06-02
10Apex Data CenterFoundation Pour & Post-Tension #0010Gabriel SantosCriticalIn Progress
25%
$41,600$45,106-$3,506High2026-03-05
11Summit Medical FacilityFoundation Pour & Post-Tension #0011Liam O'ConnorLowReview Needed
7%
$56,000$66,909-$10,909Moderate2026-08-04
12Skyline Tower Phase IIHVAC Ductwork & Chiller Install #0012Liam O'ConnorHighIn Progress
100%
$89,300$72,410+$16,890Low2026-03-29
13Summit Medical FacilityStructural Steel Erection #0013Marcus VanceLowApproved
27%
$23,400$21,727+$1,673Critical2026-05-29
14Harborview CondominiumsHVAC Ductwork & Chiller Install #0014Devon ChenCriticalIn Progress
27%
$82,600$75,313+$7,287Critical2026-06-25
15Metropolitan Transit HubFoundation Pour & Post-Tension #0015Liam O'ConnorMediumReview Needed
16%
$93,900$104,478-$10,578High2026-05-10
16Riverfront EsplanadeUnderground Utility Tie-Ins #0016Liam O'ConnorLowApproved
17%
$46,300$53,355-$7,055Low2026-05-13
17Apex Data CenterCurtain Wall Glazing #0017Sarah JenkinsCriticalApproved
97%
$15,200$13,266+$1,934Critical2026-09-06
18Riverfront EsplanadeFinal Inspection & Commissioning #0018Priya PatelHighCompleted
55%
$28,800$26,886+$1,914Critical2026-06-23
19Metropolitan Transit HubHVAC Ductwork & Chiller Install #0019Gabriel SantosMediumIn Progress
45%
$34,700$40,085-$5,385Critical2026-06-05
20Apex Data CenterElectrical Substation Wiring #0020Chloe DuboisCriticalOn Hold
25%
$85,400$94,924-$9,524High2026-09-28
21Apex Data CenterCurtain Wall Glazing #0021Priya PatelCriticalOn Hold
80%
$55,000$59,582-$4,582High2026-04-29
22Metropolitan Transit HubFoundation Pour & Post-Tension #0022Elena RostovaHighCompleted
89%
$30,800$36,156-$5,356Moderate2026-02-11
23Riverfront EsplanadeFoundation Pour & Post-Tension #0023Gabriel SantosHighIn Progress
95%
$44,300$43,481+$819High2026-08-02
24Apex Data CenterElectrical Substation Wiring #0024Devon ChenLowApproved
90%
$64,000$61,110+$2,890Low2026-07-13
25Apex Data CenterDrywall & Fire-Rating #0025Priya PatelLowCompleted
95%
$38,800$40,045-$1,245Critical2026-04-22
26Summit Medical FacilityCurtain Wall Glazing #0026Devon ChenHighCompleted
63%
$17,400$16,292+$1,108High2026-05-21
27Skyline Tower Phase IIFinal Inspection & Commissioning #0027Devon ChenLowCompleted
5%
$63,400$58,884+$4,516High2026-05-27
28Skyline Tower Phase IIElectrical Substation Wiring #0028Elena RostovaMediumIn Progress
66%
$43,000$37,074+$5,927High2026-04-26
29Apex Data CenterHVAC Ductwork & Chiller Install #0029Gabriel SantosMediumOn Hold
69%
$83,800$78,981+$4,819Moderate2026-06-17
30Metropolitan Transit HubCurtain Wall Glazing #0030Gabriel SantosMediumCompleted
61%
$67,300$80,080-$12,780Critical2026-06-13
31Skyline Tower Phase IIUnderground Utility Tie-Ins #0031Sarah JenkinsCriticalOn Hold
44%
$51,100$61,112-$10,012Low2026-07-08
32Summit Medical FacilityUnderground Utility Tie-Ins #0032Marcus VanceCriticalReview Needed
49%
$91,200$89,788+$1,412Critical2026-05-03
33Riverfront EsplanadeDrywall & Fire-Rating #0033Priya PatelLowOn Hold
36%
$90,100$90,127-$27Low2026-05-28
34Harborview CondominiumsHVAC Ductwork & Chiller Install #0034Sarah JenkinsCriticalCompleted
15%
$23,700$27,537-$3,837Low2026-08-02
35Summit Medical FacilityFinal Inspection & Commissioning #0035Sarah JenkinsMediumIn Progress
81%
$67,200$54,344+$12,856Moderate2026-05-30
36Skyline Tower Phase IICurtain Wall Glazing #0036Gabriel SantosMediumReview Needed
91%
$58,500$47,974+$10,526High2026-03-28
37Summit Medical FacilityFinal Inspection & Commissioning #0037Chloe DuboisLowReview Needed
13%
$86,100$81,011+$5,089Critical2026-06-22
38Riverfront EsplanadeFinal Inspection & Commissioning #0038Gabriel SantosHighApproved
23%
$89,700$102,182-$12,482Moderate2026-05-03
39Riverfront EsplanadeStructural Steel Erection #0039Gabriel SantosHighApproved
42%
$80,600$76,098+$4,502Low2026-07-25
40Riverfront EsplanadeStructural Steel Erection #0040Liam O'ConnorMediumCompleted
17%
$93,000$79,307+$13,693Low2026-08-09
41Apex Data CenterCurtain Wall Glazing #0041Chloe DuboisMediumCompleted
100%
$74,700$63,215+$11,485Moderate2026-04-05
42Riverfront EsplanadeElectrical Substation Wiring #0042Chloe DuboisLowCompleted
27%
$64,500$65,316-$816Moderate2026-03-02
43Apex Data CenterFinal Inspection & Commissioning #0043Gabriel SantosLowCompleted
89%
$81,400$93,520-$12,120Low2026-04-22
44Apex Data CenterDrywall & Fire-Rating #0044Devon ChenHighIn Progress
15%
$64,700$67,644-$2,944Low2026-06-22
45Summit Medical FacilityHVAC Ductwork & Chiller Install #0045Priya PatelLowCompleted
83%
$54,500$54,782-$282Critical2026-05-09
46Harborview CondominiumsStructural Steel Erection #0046Elena RostovaLowCompleted
76%
$42,000$38,386+$3,614High2026-04-21
47Skyline Tower Phase IIUnderground Utility Tie-Ins #0047Elena RostovaMediumApproved
14%
$53,200$61,930-$8,730Moderate2026-06-23
48Riverfront EsplanadeHVAC Ductwork & Chiller Install #0048Priya PatelHighOn Hold
55%
$72,700$69,153+$3,547Moderate2026-06-09
49Skyline Tower Phase IIStructural Steel Erection #0049Elena RostovaCriticalCompleted
74%
$67,900$61,797+$6,103Moderate2026-04-11
50Riverfront EsplanadeStructural Steel Erection #0050Elena RostovaMediumReview Needed
88%
$86,200$70,175+$16,025Critical2026-04-15
51Skyline Tower Phase IIStructural Steel Erection #0051Chloe DuboisHighIn Progress
30%
$18,500$18,970-$470Low2026-09-13
52Harborview CondominiumsUnderground Utility Tie-Ins #0052Marcus VanceMediumReview Needed
89%
$27,000$24,288+$2,712High2026-04-22
53Riverfront EsplanadeFoundation Pour & Post-Tension #0053Liam O'ConnorCriticalApproved
86%
$43,500$43,278+$222Moderate2026-04-26
54Metropolitan Transit HubStructural Steel Erection #0054Marcus VanceCriticalApproved
62%
$79,000$70,515+$8,485Low2026-07-01
55Metropolitan Transit HubUnderground Utility Tie-Ins #0055Priya PatelHighIn Progress
18%
$79,900$92,183-$12,283Critical2026-05-19
56Skyline Tower Phase IIHVAC Ductwork & Chiller Install #0056Priya PatelMediumIn Progress
40%
$53,100$46,881+$6,219Low2026-05-09
57Skyline Tower Phase IIFoundation Pour & Post-Tension #0057Marcus VanceHighOn Hold
97%
$70,200$68,760+$1,440Critical2026-07-04
58Skyline Tower Phase IIStructural Steel Erection #0058Elena RostovaHighOn Hold
71%
$35,800$38,305-$2,505Moderate2026-07-26
59Summit Medical FacilityStructural Steel Erection #0059Gabriel SantosMediumCompleted
61%
$80,900$89,153-$8,253High2026-04-20
60Metropolitan Transit HubFoundation Pour & Post-Tension #0060Sarah JenkinsHighReview Needed
67%
$61,900$54,319+$7,581Low2026-08-26
61Metropolitan Transit HubStructural Steel Erection #0061Liam O'ConnorMediumReview Needed
96%
$56,000$66,002-$10,002High2026-08-05
62Riverfront EsplanadeUnderground Utility Tie-Ins #0062Marcus VanceMediumApproved
78%
$44,800$47,035-$2,235Moderate2026-04-23
63Skyline Tower Phase IIElectrical Substation Wiring #0063Gabriel SantosLowApproved
100%
$57,400$47,938+$9,462High2026-04-18
64Skyline Tower Phase IIFinal Inspection & Commissioning #0064Gabriel SantosLowReview Needed
96%
$80,200$71,931+$8,269Critical2026-05-22
65Harborview CondominiumsUnderground Utility Tie-Ins #0065Marcus VanceHighIn Progress
72%
$19,200$21,664-$2,464Low2026-04-29
66Skyline Tower Phase IIStructural Steel Erection #0066Priya PatelMediumReview Needed
100%
$26,000$25,129+$871High2026-06-13
67Apex Data CenterFoundation Pour & Post-Tension #0067Elena RostovaLowIn Progress
13%
$71,700$80,561-$8,861Moderate2026-07-16
68Metropolitan Transit HubFoundation Pour & Post-Tension #0068Devon ChenLowOn Hold
89%
$75,100$61,135+$13,965Critical2026-08-05
69Summit Medical FacilityDrywall & Fire-Rating #0069Priya PatelCriticalApproved
27%
$60,400$50,847+$9,553Critical2026-04-14
70Apex Data CenterStructural Steel Erection #0070Priya PatelCriticalCompleted
69%
$55,600$46,945+$8,655Low2026-06-06
71Skyline Tower Phase IIDrywall & Fire-Rating #0071Devon ChenHighApproved
50%
$72,500$77,272-$4,772High2026-07-13
72Summit Medical FacilityCurtain Wall Glazing #0072Liam O'ConnorCriticalApproved
20%
$74,900$67,128+$7,772Low2026-06-26
73Apex Data CenterElectrical Substation Wiring #0073Devon ChenCriticalCompleted
62%
$92,500$93,500-$1,000Moderate2026-06-20
74Skyline Tower Phase IICurtain Wall Glazing #0074Marcus VanceLowOn Hold
41%
$48,000$45,805+$2,195Moderate2026-04-14
75Metropolitan Transit HubFoundation Pour & Post-Tension #0075Marcus VanceMediumIn Progress
85%
$82,400$77,816+$4,584Critical2026-02-12
76Apex Data CenterFoundation Pour & Post-Tension #0076Devon ChenCriticalReview Needed
20%
$57,700$62,203-$4,503Low2026-03-03
77Harborview CondominiumsCurtain Wall Glazing #0077Chloe DuboisCriticalApproved
67%
$51,700$58,475-$6,775Critical2026-06-18
78Apex Data CenterFinal Inspection & Commissioning #0078Chloe DuboisCriticalReview Needed
45%
$67,700$72,690-$4,990Moderate2026-04-15
79Riverfront EsplanadeHVAC Ductwork & Chiller Install #0079Gabriel SantosHighCompleted
75%
$48,300$55,094-$6,794Low2026-05-27
80Apex Data CenterFinal Inspection & Commissioning #0080Liam O'ConnorLowIn Progress
87%
$77,400$89,823-$12,423Moderate2026-05-03
81Riverfront EsplanadeFinal Inspection & Commissioning #0081Liam O'ConnorCriticalOn Hold
58%
$73,600$59,935+$13,665High2026-04-12
82Apex Data CenterDrywall & Fire-Rating #0082Gabriel SantosHighOn Hold
32%
$15,700$15,138+$562Low2026-05-11
83Summit Medical FacilityFoundation Pour & Post-Tension #0083Marcus VanceMediumApproved
31%
$55,800$64,798-$8,998High2026-04-09
84Summit Medical FacilityFoundation Pour & Post-Tension #0084Chloe DuboisLowIn Progress
23%
$20,800$17,623+$3,177High2026-07-14
85Apex Data CenterFoundation Pour & Post-Tension #0085Chloe DuboisCriticalApproved
41%
$25,900$29,958-$4,058Low2026-06-18
86Apex Data CenterStructural Steel Erection #0086Devon ChenCriticalApproved
76%
$68,000$68,684-$684Moderate2026-07-06
87Summit Medical FacilityElectrical Substation Wiring #0087Sarah JenkinsHighOn Hold
19%
$48,700$45,542+$3,158Critical2026-05-24
88Summit Medical FacilityElectrical Substation Wiring #0088Priya PatelMediumReview Needed
41%
$88,600$98,039-$9,439Low2026-05-12
89Riverfront EsplanadeFinal Inspection & Commissioning #0089Chloe DuboisMediumIn Progress
24%
$16,500$16,203+$297Critical2026-03-03
90Riverfront EsplanadeCurtain Wall Glazing #0090Marcus VanceMediumOn Hold
83%
$76,300$75,361+$939Critical2026-06-09
91Riverfront EsplanadeFoundation Pour & Post-Tension #0091Sarah JenkinsHighCompleted
97%
$77,400$80,639-$3,239Critical2026-07-14
92Harborview CondominiumsElectrical Substation Wiring #0092Priya PatelHighApproved
18%
$32,500$30,141+$2,360High2026-02-26
93Metropolitan Transit HubElectrical Substation Wiring #0093Elena RostovaMediumCompleted
81%
$21,300$17,041+$4,259Moderate2026-06-26
94Apex Data CenterFinal Inspection & Commissioning #0094Liam O'ConnorCriticalReview Needed
90%
$24,600$26,317-$1,717Critical2026-05-31
95Harborview CondominiumsElectrical Substation Wiring #0095Marcus VanceLowIn Progress
88%
$77,100$69,391+$7,709Critical2026-04-17
96Riverfront EsplanadeStructural Steel Erection #0096Sarah JenkinsCriticalReview Needed
76%
$22,900$23,132-$232Low2026-07-25
97Metropolitan Transit HubUnderground Utility Tie-Ins #0097Gabriel SantosLowReview Needed
54%
$81,600$71,740+$9,860Critical2026-06-04
98Harborview CondominiumsFoundation Pour & Post-Tension #0098Devon ChenMediumCompleted
67%
$31,300$27,837+$3,463High2026-07-28
99Riverfront EsplanadeElectrical Substation Wiring #0099Liam O'ConnorLowOn Hold
28%
$44,100$45,427-$1,327Low2026-09-11
100Riverfront EsplanadeDrywall & Fire-Rating #0100Liam O'ConnorCriticalCompleted
19%
$61,800$59,749+$2,051Low2026-07-29
101Skyline Tower Phase IIUnderground Utility Tie-Ins #0101Elena RostovaLowIn Progress
46%
$39,300$36,476+$2,824High2026-07-22
102Harborview CondominiumsCurtain Wall Glazing #0102Gabriel SantosHighApproved
14%
$40,300$45,675-$5,375High2026-08-15
103Apex Data CenterUnderground Utility Tie-Ins #0103Liam O'ConnorLowCompleted
37%
$21,000$22,155-$1,155Moderate2026-05-22
104Riverfront EsplanadeFinal Inspection & Commissioning #0104Marcus VanceMediumOn Hold
23%
$25,100$22,797+$2,303High2026-06-04
105Skyline Tower Phase IIStructural Steel Erection #0105Chloe DuboisCriticalApproved
23%
$18,300$15,376+$2,924Low2026-04-02
106Metropolitan Transit HubElectrical Substation Wiring #0106Gabriel SantosHighIn Progress
26%
$75,100$67,420+$7,680Low2026-09-01
107Apex Data CenterFinal Inspection & Commissioning #0107Marcus VanceHighCompleted
63%
$90,800$98,308-$7,508Moderate2026-05-01
108Skyline Tower Phase IIFoundation Pour & Post-Tension #0108Sarah JenkinsCriticalApproved
40%
$45,300$47,024-$1,724Low2026-04-22
109Skyline Tower Phase IIDrywall & Fire-Rating #0109Marcus VanceLowIn Progress
17%
$94,000$94,724-$724Moderate2026-05-05
110Riverfront EsplanadeDrywall & Fire-Rating #0110Elena RostovaCriticalReview Needed
82%
$81,900$70,517+$11,383High2026-07-06
111Apex Data CenterElectrical Substation Wiring #0111Sarah JenkinsLowIn Progress
29%
$46,100$52,841-$6,741Critical2026-05-16
112Skyline Tower Phase IIDrywall & Fire-Rating #0112Devon ChenCriticalOn Hold
46%
$76,400$83,075-$6,675Low2026-09-10
113Skyline Tower Phase IIUnderground Utility Tie-Ins #0113Gabriel SantosLowReview Needed
67%
$87,600$96,630-$9,030Moderate2026-08-02
114Apex Data CenterHVAC Ductwork & Chiller Install #0114Elena RostovaHighCompleted
12%
$51,500$43,874+$7,626Low2026-05-02
115Metropolitan Transit HubDrywall & Fire-Rating #0115Sarah JenkinsLowOn Hold
27%
$94,900$90,491+$4,409Low2026-08-24
116Skyline Tower Phase IIElectrical Substation Wiring #0116Chloe DuboisCriticalCompleted
54%
$27,700$32,775-$5,075Low2026-06-29
117Skyline Tower Phase IIFoundation Pour & Post-Tension #0117Marcus VanceLowIn Progress
13%
$46,700$42,238+$4,463Low2026-06-30
118Skyline Tower Phase IIHVAC Ductwork & Chiller Install #0118Elena RostovaHighApproved
11%
$70,500$77,773-$7,273Low2026-06-24
119Harborview CondominiumsStructural Steel Erection #0119Elena RostovaHighCompleted
84%
$43,800$52,052-$8,252High2026-06-21
120Skyline Tower Phase IICurtain Wall Glazing #0120Elena RostovaLowOn Hold
8%
$79,800$95,330-$15,530Low2026-04-27
121Harborview CondominiumsElectrical Substation Wiring #0121Gabriel SantosLowApproved
70%
$15,500$14,037+$1,463Low2026-06-19
122Harborview CondominiumsDrywall & Fire-Rating #0122Marcus VanceLowReview Needed
82%
$35,500$41,187-$5,687Moderate2026-08-09
123Riverfront EsplanadeHVAC Ductwork & Chiller Install #0123Liam O'ConnorCriticalIn Progress
51%
$94,900$111,890-$16,990Low2026-05-16
124Apex Data CenterCurtain Wall Glazing #0124Devon ChenMediumCompleted
90%
$43,100$51,112-$8,012Low2026-05-30
125Harborview CondominiumsElectrical Substation Wiring #0125Sarah JenkinsLowApproved
28%
$70,000$76,430-$6,430Low2026-05-25
126Apex Data CenterElectrical Substation Wiring #0126Priya PatelHighReview Needed
66%
$69,400$62,876+$6,524High2026-08-03
127Riverfront EsplanadeHVAC Ductwork & Chiller Install #0127Sarah JenkinsHighIn Progress
49%
$27,500$28,033-$533Moderate2026-07-16
128Harborview CondominiumsCurtain Wall Glazing #0128Liam O'ConnorMediumCompleted
69%
$93,600$84,593+$9,007Critical2026-08-09
129Riverfront EsplanadeStructural Steel Erection #0129Devon ChenLowApproved
14%
$27,000$24,672+$2,328Moderate2026-05-02
130Metropolitan Transit HubStructural Steel Erection #0130Devon ChenHighCompleted
11%
$18,600$19,141-$541High2026-03-04
131Riverfront EsplanadeFoundation Pour & Post-Tension #0131Marcus VanceMediumIn Progress
43%
$34,100$31,126+$2,974Critical2026-07-04
132Riverfront EsplanadeFoundation Pour & Post-Tension #0132Sarah JenkinsCriticalCompleted
52%
$39,200$37,592+$1,608Moderate2026-05-23
133Metropolitan Transit HubFoundation Pour & Post-Tension #0133Liam O'ConnorHighApproved
34%
$63,700$56,399+$7,301Critical2026-05-05
134Metropolitan Transit HubHVAC Ductwork & Chiller Install #0134Marcus VanceLowCompleted
5%
$48,300$39,504+$8,796Critical2026-07-10
135Metropolitan Transit HubStructural Steel Erection #0135Marcus VanceLowCompleted
87%
$21,100$19,153+$1,947Low2026-07-16
136Metropolitan Transit HubStructural Steel Erection #0136Gabriel SantosCriticalReview Needed
50%
$86,900$92,908-$6,008High2026-05-05
137Harborview CondominiumsStructural Steel Erection #0137Elena RostovaCriticalCompleted
31%
$56,300$67,110-$10,810Moderate2026-06-03
138Harborview CondominiumsStructural Steel Erection #0138Sarah JenkinsHighApproved
7%
$65,900$56,334+$9,566Critical2026-04-25
139Summit Medical FacilityElectrical Substation Wiring #0139Chloe DuboisCriticalIn Progress
35%
$29,200$25,056+$4,144Moderate2026-02-17
140Riverfront EsplanadeUnderground Utility Tie-Ins #0140Chloe DuboisLowCompleted
59%
$48,200$53,070-$4,870Critical2026-05-28
141Apex Data CenterCurtain Wall Glazing #0141Priya PatelLowCompleted
51%
$59,900$48,794+$11,106High2026-04-11
142Harborview CondominiumsFoundation Pour & Post-Tension #0142Elena RostovaCriticalIn Progress
30%
$61,800$69,249-$7,449Low2026-04-29
143Apex Data CenterHVAC Ductwork & Chiller Install #0143Chloe DuboisHighCompleted
82%
$26,300$28,631-$2,331Moderate2026-04-09
144Metropolitan Transit HubCurtain Wall Glazing #0144Devon ChenHighCompleted
8%
$31,900$32,969-$1,069Low2026-04-23
145Harborview CondominiumsFinal Inspection & Commissioning #0145Liam O'ConnorMediumIn Progress
48%
$77,400$67,084+$10,316High2026-08-20
146Skyline Tower Phase IIHVAC Ductwork & Chiller Install #0146Sarah JenkinsLowReview Needed
31%
$58,000$67,166-$9,166Critical2026-05-04
147Summit Medical FacilityElectrical Substation Wiring #0147Priya PatelLowReview Needed
9%
$33,000$34,180-$1,180Critical2026-06-30
148Harborview CondominiumsCurtain Wall Glazing #0148Marcus VanceLowReview Needed
74%
$25,700$30,231-$4,531Critical2026-03-28
149Skyline Tower Phase IICurtain Wall Glazing #0149Marcus VanceCriticalCompleted
28%
$55,600$45,497+$10,103High2026-03-28
150Apex Data CenterStructural Steel Erection #0150Liam O'ConnorLowCompleted
85%
$91,200$107,286-$16,086High2026-05-28
151Harborview CondominiumsDrywall & Fire-Rating #0151Gabriel SantosLowApproved
63%
$59,100$65,257-$6,157Low2026-05-05
152Harborview CondominiumsFinal Inspection & Commissioning #0152Elena RostovaMediumOn Hold
71%
$40,500$33,706+$6,794High2026-09-04
153Summit Medical FacilityStructural Steel Erection #0153Marcus VanceHighReview Needed
45%
$47,300$56,519-$9,219Low2026-03-17
154Skyline Tower Phase IIElectrical Substation Wiring #0154Sarah JenkinsCriticalOn Hold
37%
$83,100$82,907+$193Low2026-06-16
155Harborview CondominiumsCurtain Wall Glazing #0155Gabriel SantosMediumReview Needed
32%
$82,900$86,917-$4,017Critical2026-03-04
156Metropolitan Transit HubElectrical Substation Wiring #0156Priya PatelLowReview Needed
84%
$79,800$75,202+$4,598High2026-07-23
157Summit Medical FacilityFinal Inspection & Commissioning #0157Elena RostovaCriticalCompleted
17%
$34,800$31,022+$3,778Moderate2026-05-07
158Harborview CondominiumsCurtain Wall Glazing #0158Sarah JenkinsMediumIn Progress
81%
$37,800$32,329+$5,471Critical2026-05-04
159Skyline Tower Phase IIDrywall & Fire-Rating #0159Liam O'ConnorMediumReview Needed
74%
$85,700$91,977-$6,277Moderate2026-02-27
160Skyline Tower Phase IIFinal Inspection & Commissioning #0160Marcus VanceMediumCompleted
98%
$28,300$26,861+$1,439Critical2026-09-10
161Metropolitan Transit HubFoundation Pour & Post-Tension #0161Marcus VanceHighIn Progress
81%
$48,000$39,748+$8,252Critical2026-05-13
162Harborview CondominiumsCurtain Wall Glazing #0162Sarah JenkinsMediumReview Needed
38%
$51,600$48,395+$3,205High2026-06-22
163Summit Medical FacilityCurtain Wall Glazing #0163Priya PatelMediumOn Hold
43%
$94,500$112,333-$17,833Critical2026-03-10
164Summit Medical FacilityUnderground Utility Tie-Ins #0164Elena RostovaHighOn Hold
64%
$18,400$16,707+$1,693Moderate2026-04-09
165Harborview CondominiumsHVAC Ductwork & Chiller Install #0165Sarah JenkinsCriticalReview Needed
25%
$37,600$43,833-$6,233Moderate2026-05-20
166Skyline Tower Phase IICurtain Wall Glazing #0166Liam O'ConnorMediumOn Hold
39%
$73,900$61,343+$12,557Moderate2026-05-04
167Summit Medical FacilityFinal Inspection & Commissioning #0167Chloe DuboisMediumCompleted
86%
$66,400$61,125+$5,275Low2026-05-07
168Harborview CondominiumsStructural Steel Erection #0168Sarah JenkinsCriticalCompleted
74%
$54,700$58,825-$4,125High2026-04-30
169Harborview CondominiumsUnderground Utility Tie-Ins #0169Priya PatelLowApproved
6%
$58,800$59,583-$783Low2026-07-31
170Skyline Tower Phase IIUnderground Utility Tie-Ins #0170Liam O'ConnorCriticalIn Progress
89%
$79,000$71,770+$7,230High2026-05-28
171Apex Data CenterFinal Inspection & Commissioning #0171Liam O'ConnorCriticalOn Hold
9%
$69,100$71,251-$2,151Critical2026-09-01
172Apex Data CenterFoundation Pour & Post-Tension #0172Liam O'ConnorLowOn Hold
94%
$18,100$19,931-$1,831Low2026-07-31
173Riverfront EsplanadeElectrical Substation Wiring #0173Marcus VanceMediumIn Progress
63%
$43,400$50,129-$6,729High2026-08-03
174Harborview CondominiumsElectrical Substation Wiring #0174Gabriel SantosHighApproved
54%
$87,500$99,983-$12,483Low2026-05-18
175Harborview CondominiumsStructural Steel Erection #0175Elena RostovaMediumIn Progress
46%
$18,400$16,422+$1,978High2026-07-24
176Metropolitan Transit HubStructural Steel Erection #0176Liam O'ConnorCriticalApproved
88%
$65,600$58,307+$7,293Low2026-06-24
177Riverfront EsplanadeFinal Inspection & Commissioning #0177Priya PatelCriticalIn Progress
13%
$40,100$45,659-$5,559High2026-07-24
178Riverfront EsplanadeFoundation Pour & Post-Tension #0178Chloe DuboisHighReview Needed
46%
$36,000$40,967-$4,967Moderate2026-08-06
179Apex Data CenterDrywall & Fire-Rating #0179Gabriel SantosLowApproved
58%
$30,500$27,120+$3,380Low2026-04-22
180Apex Data CenterHVAC Ductwork & Chiller Install #0180Sarah JenkinsLowIn Progress
38%
$86,600$101,033-$14,433High2026-05-23
100,000 rows
@* FlexCore AG Grid Signature Showcase (Performance, Finance, HR, Inventory) *@
<div class="ag-suite-nav">
    <button class="ag-suite-tab-btn active">⚡ Performance (100k Rows)</button>
    <button class="ag-suite-tab-btn">📈 Finance & Market Ticker</button>
    <button class="ag-suite-tab-btn">👥 HR Org Directory (Tree Data)</button>
    <button class="ag-suite-tab-btn">📦 Inventory & Warehouses (Master-Detail)</button>
</div>

<!-- 1. 100k Rows Performance Stress Test -->
<GridControl TValue="AgPerformanceRow"
             DataSource="@_perfRows"
             AllowSorting="true"
             AllowSelection="true"
             AllowResizing="true"
             AllowFiltering="true"
             AllowGrouping="true"
             DefaultGroupsCollapsed="true"
             AutoPageRowThreshold="0"
             ShowGroupCount="true"
             ShowSearchBar="true"
             ShowRowCountInFooter="true"
             Height="480px">
    <GridColumnsBase>
        <GridColumn Field="Id" HeaderText="ID" Width="75px" TextAlign="TextAlign.Right" AllowGrouping="false" />
        <GridColumn Field="Project" HeaderText="Project" Width="150px" />
        <GridColumn Field="Task" HeaderText="Task Description" Width="210px" AllowGrouping="false" />
        <GridColumn Field="Assignee" HeaderText="Assignee" Width="130px" />
        <GridColumn Field="Priority" HeaderText="Priority" Width="100px" />
        <GridColumn Field="Status" HeaderText="Status" Width="115px" />
        <GridColumn Field="Progress" HeaderText="Progress" Width="120px" AllowGrouping="false" />
        <GridColumn Field="Budget" HeaderText="Budget" Width="110px" Format="$#,##0" AllowGrouping="false" />
        <GridColumn Field="ActualCost" HeaderText="Actual" Width="110px" Format="$#,##0" AllowGrouping="false" />
        <GridColumn Field="Variance" HeaderText="Variance" Width="110px" AllowGrouping="false" />
        <GridColumn Field="RiskLevel" HeaderText="Risk" Width="90px" />
        <GridColumn Field="DueDate" HeaderText="Due Date" Width="105px" Format="yyyy-MM-dd" AllowGrouping="false" />
    </GridColumnsBase>
</GridControl>

<!-- 2. Real-Time High-Frequency Financial Ticker with SVG Sparklines -->
<GridControl TValue="AgFinanceTickerRow"
             DataSource="@_financeRows"
             AllowSorting="true"
             Height="480px">
    <GridColumnsBase>
        <GridColumn Field="Ticker" HeaderText="Ticker" Width="90px" />
        <GridColumn Field="Name" HeaderText="Asset Name" Width="170px" />
        <GridColumn Field="Price" HeaderText="Price" Width="115px" />
        <GridColumn Field="Delta" HeaderText="Change ($)" Width="105px" />
        <GridColumn Field="Timeline" HeaderText="24h Trend" Width="135px">
            <Template>
                @{ var row = (AgFinanceTickerRow)context; }
                <svg class="ag-sparkline-svg" viewBox="0 0 110 24">
                    <polyline points="@GetSparklinePoints(row.Timeline)"
                              stroke="@GetSparklineStroke(row.Timeline)"
                              stroke-width="2" fill="none" />
                </svg>
            </Template>
        </GridColumn>
    </GridColumnsBase>
</GridControl>

<!-- 3. HR Organizational Tree Directory -->
<TreeGridControl TValue="AgHrEmployeeRow"
                 DataSource="@_allHrEmployees"
                 IdMapping="EmployeeID"
                 ParentIdMapping="ReportsToID"
                 TreeColumnIndex="0"
                 Height="480px">
    <TreeGridColumn Field="FullName" HeaderText="Employee Name" Width="280px" />
    <TreeGridColumn Field="JobTitle" HeaderText="Job Title" Width="220px" />
    <TreeGridColumn Field="Department" HeaderText="Department" Width="130px" />
    <TreeGridColumn Field="Salary" HeaderText="Base Salary" Width="120px" Format="$#,##0" />
</TreeGridControl>

Feature Overview & Architecture Notes

FlexCore vs. AG Grid Architecture

This showcase brings the four flagship use cases of AG Grid into the .NET ecosystem using FlexCore controls written in C#, with no wrapper around a third-party JavaScript grid:

  • 1. Performance (100,000 Rows): FlexCore renders only the visible rows plus a small buffer and recycles those elements, so DOM size does not grow with the dataset. Frame rate is not measured here.
  • 2. High-Frequency Market Ticker (Finance): High-rate delta recalculations and price flashes are computed directly in C# on server or client circuits. Sparklines are rendered via pure SVG vector math without loading heavyweight third-party charting libraries into every cell.
  • 3. Organizational Directory (HR Tree Data): TreeGridControl supports self-referential parent/child hierarchy mappings (IdMapping / ParentIdMapping) without requiring cumbersome nested DTO models.
  • 4. Supply Chain Logistics (Inventory Master-Detail): Seamlessly links high-level product catalogs to multi-warehouse breakdown rows with synchronized real-time stock actions.

Performance Comparison Matrix

Feature FlexCore (.NET 10) AG Grid (JavaScript) Advantage
Execution Runtime Native C# / Blazor WebAssembly & Server JavaScript / TypeScript V8 Strong typing and shared backend models; no JSON contract between grid and app code
Sparkline Footprint Lightweight Pure SVG polyline AG Charts JavaScript module No third-party charting script
Tree Data Binding Flat lists with IdMapping / ParentIdMapping Path arrays or nested object graphs Direct 1-to-1 match with SQL table schemas
100k Rows Memory Recycled DOM viewport + buffer Recycled DOM viewport + buffer DOM size fixed at the visible window; scroll latency not measured
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.