4-in-1 SuiteThis flagship showcase implements the 4 signature enterprise use cases featured on AG Grid's flagship live showcase: Performance (100k virtualized rows), Finance (real-time high-frequency market tickers with price flashes and SVG sparklines), HR Directory (hierarchical organizational tree with manager-report relationships and avatars), and Inventory Logistics (master-detail product catalog with multi-warehouse stock breakdown).
Built with FlexCore controls in C#. No third-party JavaScript grid library; GridControl loads its own interop script on demand. Runs on Blazor Server or WebAssembly.
Live Demo
| ID | Project | Task Description | Assignee | Priority | Status | Progress | Budget | Actual | Variance | Risk | Due Date |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0001 | Priya Patel | Medium | In Progress |
78% | $68,400 | $58,575 | +$9,825 | Low | 2026-04-06 |
| 2 | Metropolitan Transit Hub | Curtain Wall Glazing #0002 | Marcus Vance | Low | On Hold |
43% | $35,500 | $35,580 | -$80 | Low | 2026-04-26 |
| 3 | Skyline Tower Phase II | Drywall & Fire-Rating #0003 | Elena Rostova | Low | Review Needed |
54% | $22,200 | $24,022 | -$1,822 | Low | 2026-07-31 |
| 4 | Skyline Tower Phase II | Curtain Wall Glazing #0004 | Gabriel Santos | Medium | Completed |
19% | $18,300 | $16,896 | +$1,404 | Low | 2026-07-17 |
| 5 | Metropolitan Transit Hub | Final Inspection & Commissioning #0005 | Devon Chen | Medium | In Progress |
9% | $19,000 | $21,140 | -$2,140 | High | 2026-05-22 |
| 6 | Harborview Condominiums | HVAC Ductwork & Chiller Install #0006 | Marcus Vance | High | Completed |
11% | $56,200 | $46,102 | +$10,098 | High | 2026-06-10 |
| 7 | Apex Data Center | Curtain Wall Glazing #0007 | Sarah Jenkins | Critical | Approved |
6% | $20,600 | $20,304 | +$296 | Low | 2026-04-11 |
| 8 | Riverfront Esplanade | Underground Utility Tie-Ins #0008 | Sarah Jenkins | Medium | In Progress |
40% | $20,100 | $21,339 | -$1,239 | Low | 2026-04-26 |
| 9 | Metropolitan Transit Hub | Electrical Substation Wiring #0009 | Liam O'Connor | Medium | In Progress |
89% | $49,900 | $55,734 | -$5,834 | Critical | 2026-06-02 |
| 10 | Apex Data Center | Foundation Pour & Post-Tension #0010 | Gabriel Santos | Critical | In Progress |
25% | $41,600 | $45,106 | -$3,506 | High | 2026-03-05 |
| 11 | Summit Medical Facility | Foundation Pour & Post-Tension #0011 | Liam O'Connor | Low | Review Needed |
7% | $56,000 | $66,909 | -$10,909 | Moderate | 2026-08-04 |
| 12 | Skyline Tower Phase II | HVAC Ductwork & Chiller Install #0012 | Liam O'Connor | High | In Progress |
100% | $89,300 | $72,410 | +$16,890 | Low | 2026-03-29 |
| 13 | Summit Medical Facility | Structural Steel Erection #0013 | Marcus Vance | Low | Approved |
27% | $23,400 | $21,727 | +$1,673 | Critical | 2026-05-29 |
| 14 | Harborview Condominiums | HVAC Ductwork & Chiller Install #0014 | Devon Chen | Critical | In Progress |
27% | $82,600 | $75,313 | +$7,287 | Critical | 2026-06-25 |
| 15 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0015 | Liam O'Connor | Medium | Review Needed |
16% | $93,900 | $104,478 | -$10,578 | High | 2026-05-10 |
| 16 | Riverfront Esplanade | Underground Utility Tie-Ins #0016 | Liam O'Connor | Low | Approved |
17% | $46,300 | $53,355 | -$7,055 | Low | 2026-05-13 |
| 17 | Apex Data Center | Curtain Wall Glazing #0017 | Sarah Jenkins | Critical | Approved |
97% | $15,200 | $13,266 | +$1,934 | Critical | 2026-09-06 |
| 18 | Riverfront Esplanade | Final Inspection & Commissioning #0018 | Priya Patel | High | Completed |
55% | $28,800 | $26,886 | +$1,914 | Critical | 2026-06-23 |
| 19 | Metropolitan Transit Hub | HVAC Ductwork & Chiller Install #0019 | Gabriel Santos | Medium | In Progress |
45% | $34,700 | $40,085 | -$5,385 | Critical | 2026-06-05 |
| 20 | Apex Data Center | Electrical Substation Wiring #0020 | Chloe Dubois | Critical | On Hold |
25% | $85,400 | $94,924 | -$9,524 | High | 2026-09-28 |
| 21 | Apex Data Center | Curtain Wall Glazing #0021 | Priya Patel | Critical | On Hold |
80% | $55,000 | $59,582 | -$4,582 | High | 2026-04-29 |
| 22 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0022 | Elena Rostova | High | Completed |
89% | $30,800 | $36,156 | -$5,356 | Moderate | 2026-02-11 |
| 23 | Riverfront Esplanade | Foundation Pour & Post-Tension #0023 | Gabriel Santos | High | In Progress |
95% | $44,300 | $43,481 | +$819 | High | 2026-08-02 |
| 24 | Apex Data Center | Electrical Substation Wiring #0024 | Devon Chen | Low | Approved |
90% | $64,000 | $61,110 | +$2,890 | Low | 2026-07-13 |
| 25 | Apex Data Center | Drywall & Fire-Rating #0025 | Priya Patel | Low | Completed |
95% | $38,800 | $40,045 | -$1,245 | Critical | 2026-04-22 |
| 26 | Summit Medical Facility | Curtain Wall Glazing #0026 | Devon Chen | High | Completed |
63% | $17,400 | $16,292 | +$1,108 | High | 2026-05-21 |
| 27 | Skyline Tower Phase II | Final Inspection & Commissioning #0027 | Devon Chen | Low | Completed |
5% | $63,400 | $58,884 | +$4,516 | High | 2026-05-27 |
| 28 | Skyline Tower Phase II | Electrical Substation Wiring #0028 | Elena Rostova | Medium | In Progress |
66% | $43,000 | $37,074 | +$5,927 | High | 2026-04-26 |
| 29 | Apex Data Center | HVAC Ductwork & Chiller Install #0029 | Gabriel Santos | Medium | On Hold |
69% | $83,800 | $78,981 | +$4,819 | Moderate | 2026-06-17 |
| 30 | Metropolitan Transit Hub | Curtain Wall Glazing #0030 | Gabriel Santos | Medium | Completed |
61% | $67,300 | $80,080 | -$12,780 | Critical | 2026-06-13 |
| 31 | Skyline Tower Phase II | Underground Utility Tie-Ins #0031 | Sarah Jenkins | Critical | On Hold |
44% | $51,100 | $61,112 | -$10,012 | Low | 2026-07-08 |
| 32 | Summit Medical Facility | Underground Utility Tie-Ins #0032 | Marcus Vance | Critical | Review Needed |
49% | $91,200 | $89,788 | +$1,412 | Critical | 2026-05-03 |
| 33 | Riverfront Esplanade | Drywall & Fire-Rating #0033 | Priya Patel | Low | On Hold |
36% | $90,100 | $90,127 | -$27 | Low | 2026-05-28 |
| 34 | Harborview Condominiums | HVAC Ductwork & Chiller Install #0034 | Sarah Jenkins | Critical | Completed |
15% | $23,700 | $27,537 | -$3,837 | Low | 2026-08-02 |
| 35 | Summit Medical Facility | Final Inspection & Commissioning #0035 | Sarah Jenkins | Medium | In Progress |
81% | $67,200 | $54,344 | +$12,856 | Moderate | 2026-05-30 |
| 36 | Skyline Tower Phase II | Curtain Wall Glazing #0036 | Gabriel Santos | Medium | Review Needed |
91% | $58,500 | $47,974 | +$10,526 | High | 2026-03-28 |
| 37 | Summit Medical Facility | Final Inspection & Commissioning #0037 | Chloe Dubois | Low | Review Needed |
13% | $86,100 | $81,011 | +$5,089 | Critical | 2026-06-22 |
| 38 | Riverfront Esplanade | Final Inspection & Commissioning #0038 | Gabriel Santos | High | Approved |
23% | $89,700 | $102,182 | -$12,482 | Moderate | 2026-05-03 |
| 39 | Riverfront Esplanade | Structural Steel Erection #0039 | Gabriel Santos | High | Approved |
42% | $80,600 | $76,098 | +$4,502 | Low | 2026-07-25 |
| 40 | Riverfront Esplanade | Structural Steel Erection #0040 | Liam O'Connor | Medium | Completed |
17% | $93,000 | $79,307 | +$13,693 | Low | 2026-08-09 |
| 41 | Apex Data Center | Curtain Wall Glazing #0041 | Chloe Dubois | Medium | Completed |
100% | $74,700 | $63,215 | +$11,485 | Moderate | 2026-04-05 |
| 42 | Riverfront Esplanade | Electrical Substation Wiring #0042 | Chloe Dubois | Low | Completed |
27% | $64,500 | $65,316 | -$816 | Moderate | 2026-03-02 |
| 43 | Apex Data Center | Final Inspection & Commissioning #0043 | Gabriel Santos | Low | Completed |
89% | $81,400 | $93,520 | -$12,120 | Low | 2026-04-22 |
| 44 | Apex Data Center | Drywall & Fire-Rating #0044 | Devon Chen | High | In Progress |
15% | $64,700 | $67,644 | -$2,944 | Low | 2026-06-22 |
| 45 | Summit Medical Facility | HVAC Ductwork & Chiller Install #0045 | Priya Patel | Low | Completed |
83% | $54,500 | $54,782 | -$282 | Critical | 2026-05-09 |
| 46 | Harborview Condominiums | Structural Steel Erection #0046 | Elena Rostova | Low | Completed |
76% | $42,000 | $38,386 | +$3,614 | High | 2026-04-21 |
| 47 | Skyline Tower Phase II | Underground Utility Tie-Ins #0047 | Elena Rostova | Medium | Approved |
14% | $53,200 | $61,930 | -$8,730 | Moderate | 2026-06-23 |
| 48 | Riverfront Esplanade | HVAC Ductwork & Chiller Install #0048 | Priya Patel | High | On Hold |
55% | $72,700 | $69,153 | +$3,547 | Moderate | 2026-06-09 |
| 49 | Skyline Tower Phase II | Structural Steel Erection #0049 | Elena Rostova | Critical | Completed |
74% | $67,900 | $61,797 | +$6,103 | Moderate | 2026-04-11 |
| 50 | Riverfront Esplanade | Structural Steel Erection #0050 | Elena Rostova | Medium | Review Needed |
88% | $86,200 | $70,175 | +$16,025 | Critical | 2026-04-15 |
| 51 | Skyline Tower Phase II | Structural Steel Erection #0051 | Chloe Dubois | High | In Progress |
30% | $18,500 | $18,970 | -$470 | Low | 2026-09-13 |
| 52 | Harborview Condominiums | Underground Utility Tie-Ins #0052 | Marcus Vance | Medium | Review Needed |
89% | $27,000 | $24,288 | +$2,712 | High | 2026-04-22 |
| 53 | Riverfront Esplanade | Foundation Pour & Post-Tension #0053 | Liam O'Connor | Critical | Approved |
86% | $43,500 | $43,278 | +$222 | Moderate | 2026-04-26 |
| 54 | Metropolitan Transit Hub | Structural Steel Erection #0054 | Marcus Vance | Critical | Approved |
62% | $79,000 | $70,515 | +$8,485 | Low | 2026-07-01 |
| 55 | Metropolitan Transit Hub | Underground Utility Tie-Ins #0055 | Priya Patel | High | In Progress |
18% | $79,900 | $92,183 | -$12,283 | Critical | 2026-05-19 |
| 56 | Skyline Tower Phase II | HVAC Ductwork & Chiller Install #0056 | Priya Patel | Medium | In Progress |
40% | $53,100 | $46,881 | +$6,219 | Low | 2026-05-09 |
| 57 | Skyline Tower Phase II | Foundation Pour & Post-Tension #0057 | Marcus Vance | High | On Hold |
97% | $70,200 | $68,760 | +$1,440 | Critical | 2026-07-04 |
| 58 | Skyline Tower Phase II | Structural Steel Erection #0058 | Elena Rostova | High | On Hold |
71% | $35,800 | $38,305 | -$2,505 | Moderate | 2026-07-26 |
| 59 | Summit Medical Facility | Structural Steel Erection #0059 | Gabriel Santos | Medium | Completed |
61% | $80,900 | $89,153 | -$8,253 | High | 2026-04-20 |
| 60 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0060 | Sarah Jenkins | High | Review Needed |
67% | $61,900 | $54,319 | +$7,581 | Low | 2026-08-26 |
| 61 | Metropolitan Transit Hub | Structural Steel Erection #0061 | Liam O'Connor | Medium | Review Needed |
96% | $56,000 | $66,002 | -$10,002 | High | 2026-08-05 |
| 62 | Riverfront Esplanade | Underground Utility Tie-Ins #0062 | Marcus Vance | Medium | Approved |
78% | $44,800 | $47,035 | -$2,235 | Moderate | 2026-04-23 |
| 63 | Skyline Tower Phase II | Electrical Substation Wiring #0063 | Gabriel Santos | Low | Approved |
100% | $57,400 | $47,938 | +$9,462 | High | 2026-04-18 |
| 64 | Skyline Tower Phase II | Final Inspection & Commissioning #0064 | Gabriel Santos | Low | Review Needed |
96% | $80,200 | $71,931 | +$8,269 | Critical | 2026-05-22 |
| 65 | Harborview Condominiums | Underground Utility Tie-Ins #0065 | Marcus Vance | High | In Progress |
72% | $19,200 | $21,664 | -$2,464 | Low | 2026-04-29 |
| 66 | Skyline Tower Phase II | Structural Steel Erection #0066 | Priya Patel | Medium | Review Needed |
100% | $26,000 | $25,129 | +$871 | High | 2026-06-13 |
| 67 | Apex Data Center | Foundation Pour & Post-Tension #0067 | Elena Rostova | Low | In Progress |
13% | $71,700 | $80,561 | -$8,861 | Moderate | 2026-07-16 |
| 68 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0068 | Devon Chen | Low | On Hold |
89% | $75,100 | $61,135 | +$13,965 | Critical | 2026-08-05 |
| 69 | Summit Medical Facility | Drywall & Fire-Rating #0069 | Priya Patel | Critical | Approved |
27% | $60,400 | $50,847 | +$9,553 | Critical | 2026-04-14 |
| 70 | Apex Data Center | Structural Steel Erection #0070 | Priya Patel | Critical | Completed |
69% | $55,600 | $46,945 | +$8,655 | Low | 2026-06-06 |
| 71 | Skyline Tower Phase II | Drywall & Fire-Rating #0071 | Devon Chen | High | Approved |
50% | $72,500 | $77,272 | -$4,772 | High | 2026-07-13 |
| 72 | Summit Medical Facility | Curtain Wall Glazing #0072 | Liam O'Connor | Critical | Approved |
20% | $74,900 | $67,128 | +$7,772 | Low | 2026-06-26 |
| 73 | Apex Data Center | Electrical Substation Wiring #0073 | Devon Chen | Critical | Completed |
62% | $92,500 | $93,500 | -$1,000 | Moderate | 2026-06-20 |
| 74 | Skyline Tower Phase II | Curtain Wall Glazing #0074 | Marcus Vance | Low | On Hold |
41% | $48,000 | $45,805 | +$2,195 | Moderate | 2026-04-14 |
| 75 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0075 | Marcus Vance | Medium | In Progress |
85% | $82,400 | $77,816 | +$4,584 | Critical | 2026-02-12 |
| 76 | Apex Data Center | Foundation Pour & Post-Tension #0076 | Devon Chen | Critical | Review Needed |
20% | $57,700 | $62,203 | -$4,503 | Low | 2026-03-03 |
| 77 | Harborview Condominiums | Curtain Wall Glazing #0077 | Chloe Dubois | Critical | Approved |
67% | $51,700 | $58,475 | -$6,775 | Critical | 2026-06-18 |
| 78 | Apex Data Center | Final Inspection & Commissioning #0078 | Chloe Dubois | Critical | Review Needed |
45% | $67,700 | $72,690 | -$4,990 | Moderate | 2026-04-15 |
| 79 | Riverfront Esplanade | HVAC Ductwork & Chiller Install #0079 | Gabriel Santos | High | Completed |
75% | $48,300 | $55,094 | -$6,794 | Low | 2026-05-27 |
| 80 | Apex Data Center | Final Inspection & Commissioning #0080 | Liam O'Connor | Low | In Progress |
87% | $77,400 | $89,823 | -$12,423 | Moderate | 2026-05-03 |
| 81 | Riverfront Esplanade | Final Inspection & Commissioning #0081 | Liam O'Connor | Critical | On Hold |
58% | $73,600 | $59,935 | +$13,665 | High | 2026-04-12 |
| 82 | Apex Data Center | Drywall & Fire-Rating #0082 | Gabriel Santos | High | On Hold |
32% | $15,700 | $15,138 | +$562 | Low | 2026-05-11 |
| 83 | Summit Medical Facility | Foundation Pour & Post-Tension #0083 | Marcus Vance | Medium | Approved |
31% | $55,800 | $64,798 | -$8,998 | High | 2026-04-09 |
| 84 | Summit Medical Facility | Foundation Pour & Post-Tension #0084 | Chloe Dubois | Low | In Progress |
23% | $20,800 | $17,623 | +$3,177 | High | 2026-07-14 |
| 85 | Apex Data Center | Foundation Pour & Post-Tension #0085 | Chloe Dubois | Critical | Approved |
41% | $25,900 | $29,958 | -$4,058 | Low | 2026-06-18 |
| 86 | Apex Data Center | Structural Steel Erection #0086 | Devon Chen | Critical | Approved |
76% | $68,000 | $68,684 | -$684 | Moderate | 2026-07-06 |
| 87 | Summit Medical Facility | Electrical Substation Wiring #0087 | Sarah Jenkins | High | On Hold |
19% | $48,700 | $45,542 | +$3,158 | Critical | 2026-05-24 |
| 88 | Summit Medical Facility | Electrical Substation Wiring #0088 | Priya Patel | Medium | Review Needed |
41% | $88,600 | $98,039 | -$9,439 | Low | 2026-05-12 |
| 89 | Riverfront Esplanade | Final Inspection & Commissioning #0089 | Chloe Dubois | Medium | In Progress |
24% | $16,500 | $16,203 | +$297 | Critical | 2026-03-03 |
| 90 | Riverfront Esplanade | Curtain Wall Glazing #0090 | Marcus Vance | Medium | On Hold |
83% | $76,300 | $75,361 | +$939 | Critical | 2026-06-09 |
| 91 | Riverfront Esplanade | Foundation Pour & Post-Tension #0091 | Sarah Jenkins | High | Completed |
97% | $77,400 | $80,639 | -$3,239 | Critical | 2026-07-14 |
| 92 | Harborview Condominiums | Electrical Substation Wiring #0092 | Priya Patel | High | Approved |
18% | $32,500 | $30,141 | +$2,360 | High | 2026-02-26 |
| 93 | Metropolitan Transit Hub | Electrical Substation Wiring #0093 | Elena Rostova | Medium | Completed |
81% | $21,300 | $17,041 | +$4,259 | Moderate | 2026-06-26 |
| 94 | Apex Data Center | Final Inspection & Commissioning #0094 | Liam O'Connor | Critical | Review Needed |
90% | $24,600 | $26,317 | -$1,717 | Critical | 2026-05-31 |
| 95 | Harborview Condominiums | Electrical Substation Wiring #0095 | Marcus Vance | Low | In Progress |
88% | $77,100 | $69,391 | +$7,709 | Critical | 2026-04-17 |
| 96 | Riverfront Esplanade | Structural Steel Erection #0096 | Sarah Jenkins | Critical | Review Needed |
76% | $22,900 | $23,132 | -$232 | Low | 2026-07-25 |
| 97 | Metropolitan Transit Hub | Underground Utility Tie-Ins #0097 | Gabriel Santos | Low | Review Needed |
54% | $81,600 | $71,740 | +$9,860 | Critical | 2026-06-04 |
| 98 | Harborview Condominiums | Foundation Pour & Post-Tension #0098 | Devon Chen | Medium | Completed |
67% | $31,300 | $27,837 | +$3,463 | High | 2026-07-28 |
| 99 | Riverfront Esplanade | Electrical Substation Wiring #0099 | Liam O'Connor | Low | On Hold |
28% | $44,100 | $45,427 | -$1,327 | Low | 2026-09-11 |
| 100 | Riverfront Esplanade | Drywall & Fire-Rating #0100 | Liam O'Connor | Critical | Completed |
19% | $61,800 | $59,749 | +$2,051 | Low | 2026-07-29 |
| 101 | Skyline Tower Phase II | Underground Utility Tie-Ins #0101 | Elena Rostova | Low | In Progress |
46% | $39,300 | $36,476 | +$2,824 | High | 2026-07-22 |
| 102 | Harborview Condominiums | Curtain Wall Glazing #0102 | Gabriel Santos | High | Approved |
14% | $40,300 | $45,675 | -$5,375 | High | 2026-08-15 |
| 103 | Apex Data Center | Underground Utility Tie-Ins #0103 | Liam O'Connor | Low | Completed |
37% | $21,000 | $22,155 | -$1,155 | Moderate | 2026-05-22 |
| 104 | Riverfront Esplanade | Final Inspection & Commissioning #0104 | Marcus Vance | Medium | On Hold |
23% | $25,100 | $22,797 | +$2,303 | High | 2026-06-04 |
| 105 | Skyline Tower Phase II | Structural Steel Erection #0105 | Chloe Dubois | Critical | Approved |
23% | $18,300 | $15,376 | +$2,924 | Low | 2026-04-02 |
| 106 | Metropolitan Transit Hub | Electrical Substation Wiring #0106 | Gabriel Santos | High | In Progress |
26% | $75,100 | $67,420 | +$7,680 | Low | 2026-09-01 |
| 107 | Apex Data Center | Final Inspection & Commissioning #0107 | Marcus Vance | High | Completed |
63% | $90,800 | $98,308 | -$7,508 | Moderate | 2026-05-01 |
| 108 | Skyline Tower Phase II | Foundation Pour & Post-Tension #0108 | Sarah Jenkins | Critical | Approved |
40% | $45,300 | $47,024 | -$1,724 | Low | 2026-04-22 |
| 109 | Skyline Tower Phase II | Drywall & Fire-Rating #0109 | Marcus Vance | Low | In Progress |
17% | $94,000 | $94,724 | -$724 | Moderate | 2026-05-05 |
| 110 | Riverfront Esplanade | Drywall & Fire-Rating #0110 | Elena Rostova | Critical | Review Needed |
82% | $81,900 | $70,517 | +$11,383 | High | 2026-07-06 |
| 111 | Apex Data Center | Electrical Substation Wiring #0111 | Sarah Jenkins | Low | In Progress |
29% | $46,100 | $52,841 | -$6,741 | Critical | 2026-05-16 |
| 112 | Skyline Tower Phase II | Drywall & Fire-Rating #0112 | Devon Chen | Critical | On Hold |
46% | $76,400 | $83,075 | -$6,675 | Low | 2026-09-10 |
| 113 | Skyline Tower Phase II | Underground Utility Tie-Ins #0113 | Gabriel Santos | Low | Review Needed |
67% | $87,600 | $96,630 | -$9,030 | Moderate | 2026-08-02 |
| 114 | Apex Data Center | HVAC Ductwork & Chiller Install #0114 | Elena Rostova | High | Completed |
12% | $51,500 | $43,874 | +$7,626 | Low | 2026-05-02 |
| 115 | Metropolitan Transit Hub | Drywall & Fire-Rating #0115 | Sarah Jenkins | Low | On Hold |
27% | $94,900 | $90,491 | +$4,409 | Low | 2026-08-24 |
| 116 | Skyline Tower Phase II | Electrical Substation Wiring #0116 | Chloe Dubois | Critical | Completed |
54% | $27,700 | $32,775 | -$5,075 | Low | 2026-06-29 |
| 117 | Skyline Tower Phase II | Foundation Pour & Post-Tension #0117 | Marcus Vance | Low | In Progress |
13% | $46,700 | $42,238 | +$4,463 | Low | 2026-06-30 |
| 118 | Skyline Tower Phase II | HVAC Ductwork & Chiller Install #0118 | Elena Rostova | High | Approved |
11% | $70,500 | $77,773 | -$7,273 | Low | 2026-06-24 |
| 119 | Harborview Condominiums | Structural Steel Erection #0119 | Elena Rostova | High | Completed |
84% | $43,800 | $52,052 | -$8,252 | High | 2026-06-21 |
| 120 | Skyline Tower Phase II | Curtain Wall Glazing #0120 | Elena Rostova | Low | On Hold |
8% | $79,800 | $95,330 | -$15,530 | Low | 2026-04-27 |
| 121 | Harborview Condominiums | Electrical Substation Wiring #0121 | Gabriel Santos | Low | Approved |
70% | $15,500 | $14,037 | +$1,463 | Low | 2026-06-19 |
| 122 | Harborview Condominiums | Drywall & Fire-Rating #0122 | Marcus Vance | Low | Review Needed |
82% | $35,500 | $41,187 | -$5,687 | Moderate | 2026-08-09 |
| 123 | Riverfront Esplanade | HVAC Ductwork & Chiller Install #0123 | Liam O'Connor | Critical | In Progress |
51% | $94,900 | $111,890 | -$16,990 | Low | 2026-05-16 |
| 124 | Apex Data Center | Curtain Wall Glazing #0124 | Devon Chen | Medium | Completed |
90% | $43,100 | $51,112 | -$8,012 | Low | 2026-05-30 |
| 125 | Harborview Condominiums | Electrical Substation Wiring #0125 | Sarah Jenkins | Low | Approved |
28% | $70,000 | $76,430 | -$6,430 | Low | 2026-05-25 |
| 126 | Apex Data Center | Electrical Substation Wiring #0126 | Priya Patel | High | Review Needed |
66% | $69,400 | $62,876 | +$6,524 | High | 2026-08-03 |
| 127 | Riverfront Esplanade | HVAC Ductwork & Chiller Install #0127 | Sarah Jenkins | High | In Progress |
49% | $27,500 | $28,033 | -$533 | Moderate | 2026-07-16 |
| 128 | Harborview Condominiums | Curtain Wall Glazing #0128 | Liam O'Connor | Medium | Completed |
69% | $93,600 | $84,593 | +$9,007 | Critical | 2026-08-09 |
| 129 | Riverfront Esplanade | Structural Steel Erection #0129 | Devon Chen | Low | Approved |
14% | $27,000 | $24,672 | +$2,328 | Moderate | 2026-05-02 |
| 130 | Metropolitan Transit Hub | Structural Steel Erection #0130 | Devon Chen | High | Completed |
11% | $18,600 | $19,141 | -$541 | High | 2026-03-04 |
| 131 | Riverfront Esplanade | Foundation Pour & Post-Tension #0131 | Marcus Vance | Medium | In Progress |
43% | $34,100 | $31,126 | +$2,974 | Critical | 2026-07-04 |
| 132 | Riverfront Esplanade | Foundation Pour & Post-Tension #0132 | Sarah Jenkins | Critical | Completed |
52% | $39,200 | $37,592 | +$1,608 | Moderate | 2026-05-23 |
| 133 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0133 | Liam O'Connor | High | Approved |
34% | $63,700 | $56,399 | +$7,301 | Critical | 2026-05-05 |
| 134 | Metropolitan Transit Hub | HVAC Ductwork & Chiller Install #0134 | Marcus Vance | Low | Completed |
5% | $48,300 | $39,504 | +$8,796 | Critical | 2026-07-10 |
| 135 | Metropolitan Transit Hub | Structural Steel Erection #0135 | Marcus Vance | Low | Completed |
87% | $21,100 | $19,153 | +$1,947 | Low | 2026-07-16 |
| 136 | Metropolitan Transit Hub | Structural Steel Erection #0136 | Gabriel Santos | Critical | Review Needed |
50% | $86,900 | $92,908 | -$6,008 | High | 2026-05-05 |
| 137 | Harborview Condominiums | Structural Steel Erection #0137 | Elena Rostova | Critical | Completed |
31% | $56,300 | $67,110 | -$10,810 | Moderate | 2026-06-03 |
| 138 | Harborview Condominiums | Structural Steel Erection #0138 | Sarah Jenkins | High | Approved |
7% | $65,900 | $56,334 | +$9,566 | Critical | 2026-04-25 |
| 139 | Summit Medical Facility | Electrical Substation Wiring #0139 | Chloe Dubois | Critical | In Progress |
35% | $29,200 | $25,056 | +$4,144 | Moderate | 2026-02-17 |
| 140 | Riverfront Esplanade | Underground Utility Tie-Ins #0140 | Chloe Dubois | Low | Completed |
59% | $48,200 | $53,070 | -$4,870 | Critical | 2026-05-28 |
| 141 | Apex Data Center | Curtain Wall Glazing #0141 | Priya Patel | Low | Completed |
51% | $59,900 | $48,794 | +$11,106 | High | 2026-04-11 |
| 142 | Harborview Condominiums | Foundation Pour & Post-Tension #0142 | Elena Rostova | Critical | In Progress |
30% | $61,800 | $69,249 | -$7,449 | Low | 2026-04-29 |
| 143 | Apex Data Center | HVAC Ductwork & Chiller Install #0143 | Chloe Dubois | High | Completed |
82% | $26,300 | $28,631 | -$2,331 | Moderate | 2026-04-09 |
| 144 | Metropolitan Transit Hub | Curtain Wall Glazing #0144 | Devon Chen | High | Completed |
8% | $31,900 | $32,969 | -$1,069 | Low | 2026-04-23 |
| 145 | Harborview Condominiums | Final Inspection & Commissioning #0145 | Liam O'Connor | Medium | In Progress |
48% | $77,400 | $67,084 | +$10,316 | High | 2026-08-20 |
| 146 | Skyline Tower Phase II | HVAC Ductwork & Chiller Install #0146 | Sarah Jenkins | Low | Review Needed |
31% | $58,000 | $67,166 | -$9,166 | Critical | 2026-05-04 |
| 147 | Summit Medical Facility | Electrical Substation Wiring #0147 | Priya Patel | Low | Review Needed |
9% | $33,000 | $34,180 | -$1,180 | Critical | 2026-06-30 |
| 148 | Harborview Condominiums | Curtain Wall Glazing #0148 | Marcus Vance | Low | Review Needed |
74% | $25,700 | $30,231 | -$4,531 | Critical | 2026-03-28 |
| 149 | Skyline Tower Phase II | Curtain Wall Glazing #0149 | Marcus Vance | Critical | Completed |
28% | $55,600 | $45,497 | +$10,103 | High | 2026-03-28 |
| 150 | Apex Data Center | Structural Steel Erection #0150 | Liam O'Connor | Low | Completed |
85% | $91,200 | $107,286 | -$16,086 | High | 2026-05-28 |
| 151 | Harborview Condominiums | Drywall & Fire-Rating #0151 | Gabriel Santos | Low | Approved |
63% | $59,100 | $65,257 | -$6,157 | Low | 2026-05-05 |
| 152 | Harborview Condominiums | Final Inspection & Commissioning #0152 | Elena Rostova | Medium | On Hold |
71% | $40,500 | $33,706 | +$6,794 | High | 2026-09-04 |
| 153 | Summit Medical Facility | Structural Steel Erection #0153 | Marcus Vance | High | Review Needed |
45% | $47,300 | $56,519 | -$9,219 | Low | 2026-03-17 |
| 154 | Skyline Tower Phase II | Electrical Substation Wiring #0154 | Sarah Jenkins | Critical | On Hold |
37% | $83,100 | $82,907 | +$193 | Low | 2026-06-16 |
| 155 | Harborview Condominiums | Curtain Wall Glazing #0155 | Gabriel Santos | Medium | Review Needed |
32% | $82,900 | $86,917 | -$4,017 | Critical | 2026-03-04 |
| 156 | Metropolitan Transit Hub | Electrical Substation Wiring #0156 | Priya Patel | Low | Review Needed |
84% | $79,800 | $75,202 | +$4,598 | High | 2026-07-23 |
| 157 | Summit Medical Facility | Final Inspection & Commissioning #0157 | Elena Rostova | Critical | Completed |
17% | $34,800 | $31,022 | +$3,778 | Moderate | 2026-05-07 |
| 158 | Harborview Condominiums | Curtain Wall Glazing #0158 | Sarah Jenkins | Medium | In Progress |
81% | $37,800 | $32,329 | +$5,471 | Critical | 2026-05-04 |
| 159 | Skyline Tower Phase II | Drywall & Fire-Rating #0159 | Liam O'Connor | Medium | Review Needed |
74% | $85,700 | $91,977 | -$6,277 | Moderate | 2026-02-27 |
| 160 | Skyline Tower Phase II | Final Inspection & Commissioning #0160 | Marcus Vance | Medium | Completed |
98% | $28,300 | $26,861 | +$1,439 | Critical | 2026-09-10 |
| 161 | Metropolitan Transit Hub | Foundation Pour & Post-Tension #0161 | Marcus Vance | High | In Progress |
81% | $48,000 | $39,748 | +$8,252 | Critical | 2026-05-13 |
| 162 | Harborview Condominiums | Curtain Wall Glazing #0162 | Sarah Jenkins | Medium | Review Needed |
38% | $51,600 | $48,395 | +$3,205 | High | 2026-06-22 |
| 163 | Summit Medical Facility | Curtain Wall Glazing #0163 | Priya Patel | Medium | On Hold |
43% | $94,500 | $112,333 | -$17,833 | Critical | 2026-03-10 |
| 164 | Summit Medical Facility | Underground Utility Tie-Ins #0164 | Elena Rostova | High | On Hold |
64% | $18,400 | $16,707 | +$1,693 | Moderate | 2026-04-09 |
| 165 | Harborview Condominiums | HVAC Ductwork & Chiller Install #0165 | Sarah Jenkins | Critical | Review Needed |
25% | $37,600 | $43,833 | -$6,233 | Moderate | 2026-05-20 |
| 166 | Skyline Tower Phase II | Curtain Wall Glazing #0166 | Liam O'Connor | Medium | On Hold |
39% | $73,900 | $61,343 | +$12,557 | Moderate | 2026-05-04 |
| 167 | Summit Medical Facility | Final Inspection & Commissioning #0167 | Chloe Dubois | Medium | Completed |
86% | $66,400 | $61,125 | +$5,275 | Low | 2026-05-07 |
| 168 | Harborview Condominiums | Structural Steel Erection #0168 | Sarah Jenkins | Critical | Completed |
74% | $54,700 | $58,825 | -$4,125 | High | 2026-04-30 |
| 169 | Harborview Condominiums | Underground Utility Tie-Ins #0169 | Priya Patel | Low | Approved |
6% | $58,800 | $59,583 | -$783 | Low | 2026-07-31 |
| 170 | Skyline Tower Phase II | Underground Utility Tie-Ins #0170 | Liam O'Connor | Critical | In Progress |
89% | $79,000 | $71,770 | +$7,230 | High | 2026-05-28 |
| 171 | Apex Data Center | Final Inspection & Commissioning #0171 | Liam O'Connor | Critical | On Hold |
9% | $69,100 | $71,251 | -$2,151 | Critical | 2026-09-01 |
| 172 | Apex Data Center | Foundation Pour & Post-Tension #0172 | Liam O'Connor | Low | On Hold |
94% | $18,100 | $19,931 | -$1,831 | Low | 2026-07-31 |
| 173 | Riverfront Esplanade | Electrical Substation Wiring #0173 | Marcus Vance | Medium | In Progress |
63% | $43,400 | $50,129 | -$6,729 | High | 2026-08-03 |
| 174 | Harborview Condominiums | Electrical Substation Wiring #0174 | Gabriel Santos | High | Approved |
54% | $87,500 | $99,983 | -$12,483 | Low | 2026-05-18 |
| 175 | Harborview Condominiums | Structural Steel Erection #0175 | Elena Rostova | Medium | In Progress |
46% | $18,400 | $16,422 | +$1,978 | High | 2026-07-24 |
| 176 | Metropolitan Transit Hub | Structural Steel Erection #0176 | Liam O'Connor | Critical | Approved |
88% | $65,600 | $58,307 | +$7,293 | Low | 2026-06-24 |
| 177 | Riverfront Esplanade | Final Inspection & Commissioning #0177 | Priya Patel | Critical | In Progress |
13% | $40,100 | $45,659 | -$5,559 | High | 2026-07-24 |
| 178 | Riverfront Esplanade | Foundation Pour & Post-Tension #0178 | Chloe Dubois | High | Review Needed |
46% | $36,000 | $40,967 | -$4,967 | Moderate | 2026-08-06 |
| 179 | Apex Data Center | Drywall & Fire-Rating #0179 | Gabriel Santos | Low | Approved |
58% | $30,500 | $27,120 | +$3,380 | Low | 2026-04-22 |
| 180 | Apex Data Center | HVAC Ductwork & Chiller Install #0180 | Sarah Jenkins | Low | In Progress |
38% | $86,600 | $101,033 | -$14,433 | High | 2026-05-23 |
@* FlexCore AG Grid Signature Showcase (Performance, Finance, HR, Inventory) *@
<div class="ag-suite-nav">
<button class="ag-suite-tab-btn active">⚡ Performance (100k Rows)</button>
<button class="ag-suite-tab-btn">📈 Finance & Market Ticker</button>
<button class="ag-suite-tab-btn">👥 HR Org Directory (Tree Data)</button>
<button class="ag-suite-tab-btn">📦 Inventory & Warehouses (Master-Detail)</button>
</div>
<!-- 1. 100k Rows Performance Stress Test -->
<GridControl TValue="AgPerformanceRow"
DataSource="@_perfRows"
AllowSorting="true"
AllowSelection="true"
AllowResizing="true"
AllowFiltering="true"
AllowGrouping="true"
DefaultGroupsCollapsed="true"
AutoPageRowThreshold="0"
ShowGroupCount="true"
ShowSearchBar="true"
ShowRowCountInFooter="true"
Height="480px">
<GridColumnsBase>
<GridColumn Field="Id" HeaderText="ID" Width="75px" TextAlign="TextAlign.Right" AllowGrouping="false" />
<GridColumn Field="Project" HeaderText="Project" Width="150px" />
<GridColumn Field="Task" HeaderText="Task Description" Width="210px" AllowGrouping="false" />
<GridColumn Field="Assignee" HeaderText="Assignee" Width="130px" />
<GridColumn Field="Priority" HeaderText="Priority" Width="100px" />
<GridColumn Field="Status" HeaderText="Status" Width="115px" />
<GridColumn Field="Progress" HeaderText="Progress" Width="120px" AllowGrouping="false" />
<GridColumn Field="Budget" HeaderText="Budget" Width="110px" Format="$#,##0" AllowGrouping="false" />
<GridColumn Field="ActualCost" HeaderText="Actual" Width="110px" Format="$#,##0" AllowGrouping="false" />
<GridColumn Field="Variance" HeaderText="Variance" Width="110px" AllowGrouping="false" />
<GridColumn Field="RiskLevel" HeaderText="Risk" Width="90px" />
<GridColumn Field="DueDate" HeaderText="Due Date" Width="105px" Format="yyyy-MM-dd" AllowGrouping="false" />
</GridColumnsBase>
</GridControl>
<!-- 2. Real-Time High-Frequency Financial Ticker with SVG Sparklines -->
<GridControl TValue="AgFinanceTickerRow"
DataSource="@_financeRows"
AllowSorting="true"
Height="480px">
<GridColumnsBase>
<GridColumn Field="Ticker" HeaderText="Ticker" Width="90px" />
<GridColumn Field="Name" HeaderText="Asset Name" Width="170px" />
<GridColumn Field="Price" HeaderText="Price" Width="115px" />
<GridColumn Field="Delta" HeaderText="Change ($)" Width="105px" />
<GridColumn Field="Timeline" HeaderText="24h Trend" Width="135px">
<Template>
@{ var row = (AgFinanceTickerRow)context; }
<svg class="ag-sparkline-svg" viewBox="0 0 110 24">
<polyline points="@GetSparklinePoints(row.Timeline)"
stroke="@GetSparklineStroke(row.Timeline)"
stroke-width="2" fill="none" />
</svg>
</Template>
</GridColumn>
</GridColumnsBase>
</GridControl>
<!-- 3. HR Organizational Tree Directory -->
<TreeGridControl TValue="AgHrEmployeeRow"
DataSource="@_allHrEmployees"
IdMapping="EmployeeID"
ParentIdMapping="ReportsToID"
TreeColumnIndex="0"
Height="480px">
<TreeGridColumn Field="FullName" HeaderText="Employee Name" Width="280px" />
<TreeGridColumn Field="JobTitle" HeaderText="Job Title" Width="220px" />
<TreeGridColumn Field="Department" HeaderText="Department" Width="130px" />
<TreeGridColumn Field="Salary" HeaderText="Base Salary" Width="120px" Format="$#,##0" />
</TreeGridControl>Feature Overview & Architecture Notes
FlexCore vs. AG Grid Architecture
This showcase brings the four flagship use cases of AG Grid into the .NET ecosystem using FlexCore controls written in C#, with no wrapper around a third-party JavaScript grid:
- 1. Performance (100,000 Rows): FlexCore renders only the visible rows plus a small buffer and recycles those elements, so DOM size does not grow with the dataset. Frame rate is not measured here.
- 2. High-Frequency Market Ticker (Finance): High-rate delta recalculations and price flashes are computed directly in C# on server or client circuits. Sparklines are rendered via pure SVG vector math without loading heavyweight third-party charting libraries into every cell.
- 3. Organizational Directory (HR Tree Data):
TreeGridControlsupports self-referential parent/child hierarchy mappings (IdMapping/ParentIdMapping) without requiring cumbersome nested DTO models. - 4. Supply Chain Logistics (Inventory Master-Detail): Seamlessly links high-level product catalogs to multi-warehouse breakdown rows with synchronized real-time stock actions.
Performance Comparison Matrix
| Feature | FlexCore (.NET 10) | AG Grid (JavaScript) | Advantage |
|---|---|---|---|
| Execution Runtime | Native C# / Blazor WebAssembly & Server | JavaScript / TypeScript V8 | Strong typing and shared backend models; no JSON contract between grid and app code |
| Sparkline Footprint | Lightweight Pure SVG polyline | AG Charts JavaScript module | No third-party charting script |
| Tree Data Binding | Flat lists with IdMapping / ParentIdMapping |
Path arrays or nested object graphs | Direct 1-to-1 match with SQL table schemas |
| 100k Rows Memory | Recycled DOM viewport + buffer | Recycled DOM viewport + buffer | DOM size fixed at the visible window; scroll latency not measured |